Disassembly process of corrosion-resistant centrifugal pumps
Disassemble the corrosion-resistant centrifugal pump coupling and set the positioning mark of the coupling
Check the concentricity and axial clearance of the coupling and make records
Disassemble the auxiliary pipeline
Use special tools to disassemble the half coupling of the corrosion-resistant centrifugal pump
Loosen the front and rear sealing bolts, and remove the front and rear bearing seats and bearings
Measure the single displacement of the corrosion-resistant pump
Remove the front and rear seals
Remove the balance plate and replace it with a special shaft sleeve with the same length as the balance plate. Tighten the rear shaft sleeve to the original position of the balance plate and measure the total displacement of the pump. After measuring, take out the shaft sleeve and special shaft sleeve
After disassembling the large tension bolts on the corrosion-resistant centrifugal pump body, remove the outlet section and the final stage impeller
Disassemble the middle section and impeller step by step from back to front in order, and measure the displacement of each stage of impeller. But when measuring, it is necessary to tighten the large bolts and rotor, so that the measured displacement is accurate

.jpg)


